Construction terms explained

Plain-language meanings of the terms you will meet when briefing a contractor, with links to the services where they apply.

RCC
Reinforced cement concrete: steel reinforcement cast inside concrete. It forms the foundations, columns, beams and slabs that carry a building. Read about our work.
EPC
Engineering, procurement and construction. In an EPC contract one contractor is responsible for delivering the finished project. Read about our work.
Turnkey
A contract where you hand over the plot and the contractor delivers a ready-to-use structure. Read about our work.
PMC
Project management consultant: an outside firm appointed by the client to oversee coordination, cost and schedule.
Block work
Masonry made of blocks laid in mortar to form walls, partitions and shafts between the structural frame. Read about our work.
AAC block
Autoclaved aerated concrete block: a light, insulating block used for walls. Whether it is used depends on the project specification. Read about our work.
Plaster
A coat of cement or gypsum mortar applied over masonry to give an even, finished surface. Read about our work.
Gypsum plaster
A smooth plaster used on internal walls and ceilings, where a fine finish is wanted. Read about our work.
UCR masonry
Uncoursed rubble masonry: stone laid in mortar without regular courses, used for foundations, retaining and boundary walls. Read about our work.
Gabion wall
A wall of wire-mesh cages filled with stone. It retains earth, holds slopes and lets water drain through. Read about our work.
Gabion mattress
A flat, shallow gabion laid along riverbeds and banks to resist erosion and scour. Read about our work.
Retaining wall
A wall built to hold back soil where the ground levels change. Read about our work.
Compound wall
A boundary wall around a plot that marks the limit of the property and controls access. Read about our work.
Stone cladding
A decorative stone finish applied over a built wall, used for entrances, boundaries and landscaped areas. Read about our work.
Slab cycle
The time taken to complete one floor’s structure before starting the next. On high-rise projects, masonry and plaster follow behind it.
Aluminium formwork
Reusable aluminium panels used to cast walls and slabs together, which gives fast construction cycles. Masonry methods must be compatible with it.
Line and level
Marking and checking that walls are straight, upright and at the right height before and during construction. Read about our work.
Backfilling
Refilling the excavated area around foundations with soil, usually in layers, so the ground is stable. Read about our work.
Toolbox talk
A short safety briefing given to workers before work starts.
PPE
Personal protective equipment, such as helmets, boots and gloves, worn by workers on site.